TWO PARALLEL NATO OIL PIPELINE DISPLACEMENT WORK AT MOTORWAY SECTION 5, OSMANİYE-NURDAĞI ROAD ROUTE, BETWEEN KM: 11+000-13+200
Project Name
Two Parallel Nato oil Pipe Line Displacement Works at Motorway section 5. Osmaniye - Nurdağı Road between KP (11+000 13+200)
Client
General Directorate of Highways Mersin 5. Regional Deparment
Contractor
Ener İnşaat Savunma Sistemleri Sanayi ve Ticaret A.Ş
Date of Contract
17.08.2010
Project Duration
153 Days
Consultant
Tümaş
Project Description
Osmaniye-Nurdağı Road between KM11+000-13+200 Section ,Displacement of 2 Parallel Steel Oil Pipe Lines of 8" and 10" PN 100
P/L Class
Fuel
Steel Pipe Purchase and Piping
8'' PE Insulated 2268m. 10'' PE Insulated 2263m.
Hydrostatic Test
4531m.
Road Crossing (Casing) (8''- 10'')
1025m.
Horizontal Boring
99m.
Pipe Concrete Coating
175m.
32 Lb Magnesium Anot measurement box
22 unit